Ghana Air Force Takes Delivery of New Dassault Falcon 6X Jet

by | Nov 17, 2026 | Aviación militar, Noticias | 0 comments

For much of 2025, Ghana’s presidential jet was not in Ghana. The 16-year-old Dassault Falcon 900EX sat in France for months while engineers dealt with corrosion in its fuel tanks and a fuel leak. On Monday 16 November 2026, Accra announced its replacement had arrived.

Felix Kwakye Ofosu, Ghana’s Minister for Government Communications, said in social media posts that the Ghana Air Force had taken delivery of a new Dassault Falcon 6X, the French manufacturer’s largest-cabin business jet.

Datos rápidos

  • Operador: Ghana Air Force
  • Nuevos aviones: One Dassault Falcon 6X
  • Anunciado: Monday 16 November 2026, by Minister Felix Kwakye Ofosu
  • Contract value: US$60.68 million (parliamentary contract figure)
  • Approved by Parliament: 4 December 2025, alongside €125.97 million for four Airbus helicopters
  • Sustituye a: Falcon 900EX 9G-EXE, in service since 2010
  • Falcon 6X range: 5,500 nm (10,186 km), Mach 0.90 maximum, two PW812D engines

Approved in a single week

The purchase went through Parliament quickly. According to the Daily Graphic, Deputy Defence Minister Ernest Brogya Genfi laid the contract before the House on 3 December 2025, and the minister says Parliament approved it on 4 December. The sale and purchase agreement with Dassault Aviation was for one Falcon 6X at US$60.68 million.

It came as part of a bigger package. The same week, Parliament approved a €125.97 million contract with Airbus Helicopters for one H160 and three H175 helicopters for the Ghana Air Force. The helicopters need a production lead time of about three years, the Daily Graphic reported, so the jet is the first part of the package to arrive.

Republic of Ghana Dassault Falcon 900EX presidential jet 9G-EXE taxiing
The aircraft being replaced: the Republic of Ghana’s Falcon 900EX, 9G-EXE, photographed in 2024. Fuel-tank corrosion and a fuel leak kept it in France for months in 2025. Photo: Anna Zvereva / Wikimedia Commons, CC BY-SA 2.0

James Agalga, chairman of Parliament’s Committee on Defence and Interior, told the House that much of the air force’s fleet had reached an advanced age and that many aircraft were grounded by maintenance problems. He argued that new aircraft would cost less to run over their lives than keeping old ones flying.

“It was evident that continued reliance on the ageing Mi-17 helicopter fleet and the Falcon 900EX aircraft has become financially unsustainable and operationally inefficient for the Ghana Air Force.”
James Agalga — Chairman, Ghana Parliament Committee on Defence and Interior, December 2025 (via the Daily Graphic)

According to Agalga, the committee estimated that over a projected 15-year service life, the new fleet’s total lifecycle cost would be 30 to 40 per cent lower than that of operating the ageing aircraft.

The deal also had cross-party backing. The Minority’s ranking member on the defence committee, John Ntim Fordjour, told the House his side supported retooling the air force and said the President’s safety on official travel had to be a priority, the Daily Graphic reported. He also recalled past political fights over efforts to equip the air force.

From three engines to two

The aircraft being replaced is a Falcon 900EX, registered 9G-EXE, which the Daily Graphic says has been in service since 2010. Like all Falcon 900s it is a trijet, with three Honeywell TFE731 engines, and Dassault rated the original 900EX at about 4,500 nautical miles.

The Falcon 6X is a twinjet built around two Pratt & Whitney Canada PW812D turbofans. Dassault quotes a range of 5,500 nautical miles (10,186 km), a maximum operating speed of Mach 0.90 and seating for 12 to 16 passengers. Its cabin is 2.58 metres wide and 1.98 metres high, which Dassault calls the tallest and widest in business aviation.

Dassault Falcon’s own film of the Falcon 6X, the type Ghana has now received.

The 6X is a young design. Launched in December 2017 after Dassault abandoned the troubled Falcon 5X, it first flew on 10 March 2021, won US and European certification in August 2023 and entered service on 30 November 2023.

“The new jet has a longer range and therefore eliminates the need for frequent refuelling stops.”
Felix Kwakye Ofosu — Ghana Minister for Government Communications, 16 November 2026 (via Pulse Ghana)

A jet that had become a headache

Range is the selling point in Accra. Kwakye Ofosu said the new aircraft’s longer reach will remove the need for frequent refuelling stops on long trips, a practical problem for a head of state flying from West Africa to Europe, Asia or the Americas.

Dassault Falcon 6X prototype F-WSIX on the runway at Bordeaux-Merignac airport in 2021
The first Falcon 6X, F-WSIX, at Bordeaux-Mérignac in March 2021, days before its first flight. This is Dassault’s demonstrator, not the Ghanaian aircraft. Photo: dylan3300 / Wikimedia Commons, CC0

The minister did not give the aircraft’s registration or say when it will fly its first official mission, and Dassault had not announced the delivery in the reports we reviewed. Local reports have used different price figures: the Daily Graphic gives the parliamentary contract figure of US$60.68 million, while Pulse Ghana reported the jet as worth €50 million.

What happens to the old 900EX has not been announced. For President John Dramani Mahama’s government, the new Falcon 6X closes a chapter in which the presidential jet spent months in a French repair shop, and opens one in which Ghana flies one of the newest large business jets in service anywhere.

Sources: Felix Kwakye Ofosu (X post, 16 Nov 2026), Daily Graphic, MyJoyOnline, Citi Newsroom, Adom Online, Pulse Ghana, Dassault Aviation, Wikipedia (Dassault Falcon 6X; Dassault Falcon 900)

Header photo: Dassault Falcon 6X demonstrator F-WSIX, not the Ghanaian aircraft. Ibex73 / Wikimedia Commons, CC BY 4.0

Preguntas frecuentes

What new presidential jet has Ghana bought?
Ghana has bought a Dassault Falcon 6X business jet for the Ghana Air Force. Minister for Government Communications Felix Kwakye Ofosu announced its delivery on 16 November 2026. It replaces the Falcon 900EX that has served as Ghana’s presidential jet since 2010.
How much did Ghana pay for the Falcon 6X?
The contract with Dassault Aviation approved by Ghana’s Parliament in December 2025 was for one Falcon 6X at US$60.68 million, according to the Daily Graphic. Some local reports have used other figures, including Pulse Ghana, which put the jet’s value at 50 million euros.
Why is Ghana replacing its Falcon 900EX?
Ghana’s Falcon 900EX is 16 years old and has had recurring maintenance problems, including corrosion in its fuel tanks and a fuel leak that kept it in France for repairs for several months in 2025. Parliament’s defence committee said relying on it had become financially unsustainable.
What is the range of the Dassault Falcon 6X?
Dassault quotes a range of 5,500 nautical miles (10,186 km) for the Falcon 6X, with a maximum operating speed of Mach 0.90. The twinjet is powered by two Pratt and Whitney Canada PW812D engines and seats 12 to 16 passengers in a cabin 2.58 metres wide.
When did Ghana’s Parliament approve the Falcon 6X purchase?
Ghana’s Parliament approved the Falcon 6X contract on 4 December 2025, a day after Deputy Defence Minister Ernest Brogya Genfi laid it before the House. It approved a 125.97 million euro contract with Airbus Helicopters for one H160 and three H175 helicopters at the same time.
When did the Dassault Falcon 6X enter service?
The Dassault Falcon 6X was launched in December 2017, first flew on 10 March 2021, received US and European type certification in August 2023 and entered service on 30 November 2023. It replaced the cancelled Falcon 5X programme in Dassault’s line-up.

Publicaciones relacionadas

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *