Air Force Global Strike Command has published a progress report on its effort to fix bomber readiness, and it contains one conspicuous absence: any mission capable rate.

The North Star Readiness Campaign began in the summer of 2025 and reached its first anniversary this month. In a release dated 8 September from Barksdale, the command described daily aircraft-on-ground meetings that put the Defense Logistics Agency, the supply-chain enterprise, base logistics readiness squadrons and flight-line maintainers in the same room, streamlined depot cycles negotiated with Air Force Materiel Command, and a maintenance playbook written by the airmen who actually do the work.

The claimed results are genuine improvements, if they hold. B-1 parts problems serious enough to ground an aircraft, what the Air Force calls MICAPs, are said to have fallen from more than 450 to around 160. Some lateral parts shipments that used to take over a week now take two or three days. Every one of those figures comes from a single Air Force press release, and none has been independently verified.

Quick Facts

Campaign: North Star Readiness Campaign, launched summer 2025

Announced: 8 September 2026, Air Force Global Strike Command, Barksdale AFB

Run by: AFGSC with Air Force Materiel Command and the Defense Logistics Agency

Claimed result: B-1 MICAPs down from over 450 to roughly 160

Mission capable rates published: None

Last published rates (2024): B-52H 54 per cent, B-1B 43 per cent

Inventory: 45 B-1B Lancers, 75 B-52H Stratofortresses

B-52H average age: About 65 years. The newest was delivered in 1962

The numbers that are missing

The Air Force stopped publishing mission capable data after 2024. The last figures released put the B-52H at 54 per cent and the B-1B at 43 per cent, both on a multi-year decline. A mission capable rate of 43 per cent means that on an average day, fewer than half the Lancers on the books can fly a mission.

That is the benchmark against which a readiness campaign should be measured, and it is precisely the number AFGSC did not provide. Claiming improvement while withholding the metric is not the same thing as demonstrating it. The MICAP count is a useful proxy, but it measures the supply chain rather than the fleet.

“The North Star Readiness Campaign is our commitment to ensuring the warfighter has the nation’s bomber force ready to go at a moment’s notice.”
Gen. S. L. Davis — Commander, Air Force Global Strike Command, 8 September 2026

What the campaign has plainly changed is process. Chief Master Sgt. Shane Anderson, who leads change management for the effort, made the point that the fixes are not purely top-down.

“The NSRC started as a concept at the strategic level, but we have also received ideas directly from the flight line.”
Chief Master Sgt. Shane Anderson — North Star Readiness Campaign change management lead, 8 September 2026
A B-52H Stratofortress taking off
A B-52H gets airborne in June 2026. The youngest Stratofortress on strength was delivered in 1962. US Air Force photo by Airman 1st Class Addison Bolt.

What the GAO said six weeks earlier

The optimism sits awkwardly beside a Government Accountability Office report published on 31 July 2026. That document found the B-52 had met its readiness goals only four times between financial years 2011 and 2021, and it was scathing about the programme meant to keep the aircraft flying to the 2050s.

The Commercial Engine Replacement Program swaps all eight Pratt and Whitney TF33s on each aircraft for eight Rolls-Royce F130s, producing the B-52J. It cleared Critical Design Review in May 2026, roughly three years late. Its cost has risen to 15.4 billion dollars against an original estimate near 3 billion, an increase of 38 per cent since 2018 alone, and it now accounts for about three quarters of the entire 13-programme B-52 modernisation effort. The GAO expects developmental flight testing to slip to early financial year 2029, four years late, with initial operational capability in 2033, five years late. Production is scheduled to begin alongside flight testing. The GAO recommended delaying that production decision. The Air Force disagreed.

A B-52H towed diagonally into a hangar at Tinker Air Force Base
Depot maintenance at Tinker. The B-52’s wingspan is wider than the hangar, so the aircraft is crabbed in diagonally. Boeing representatives attended this tow to study the process ahead of the engine replacement programme. US Air Force photo by Paul Shirk.

The radar is going the same way. The AN/APQ-188 Radar Modernization Program triggered a significant Nunn-McCurdy breach in May 2025, with costs up about 30 per cent to roughly 2.9 billion dollars and initial operational capability pushed to the third quarter of financial year 2030. Then the radar testbed aircraft crashed at Edwards Air Force Base on 15 June 2026, and officials acknowledged in July that the loss would probably add further delay.

B-1B Lancers recovering at Dyess Air Force Base, home of the 7th Bomb Wing.

Why it has to work

The B-1 fleet stands at 45 aircraft after 17 of the most fatigued airframes were retired over the past five years, and the average age is approaching 40. The Air Force has now reversed its earlier plan to retire the Lancer in the early 2030s and intends to fly both the B-1 and the B-2 through 2037, with roughly 342 million dollars of B-1 modernisation programmed between financial years 2027 and 2031.

That reversal is the real driver here. The B-21 Raider is arriving, but not quickly enough to let anything else go. Until it does, the United States has to keep a 65-year-old bomber and a 40-year-old one available at rates that have been falling for a decade, using parts that in some cases are no longer manufactured.

A campaign that cuts grounding parts shortages by two thirds is a real achievement, and the airmen who did it deserve the credit. Whether it has moved the number that matters is something the Air Force has chosen not to say.

Sources: Air Force Global Strike Command release, 8 September 2026; Air & Space Forces Magazine; US Government Accountability Office report GAO-26-109272, 31 July 2026.

Frequently Asked Questions

What is the North Star Readiness Campaign?
It is an Air Force Global Strike Command effort, launched in summer 2025, to improve mission readiness of the B-1B Lancer and B-52H Stratofortress. It works through daily aircraft-on-ground meetings, streamlined depot maintenance cycles and faster parts supply, in partnership with Air Force Materiel Command and the Defense Logistics Agency.
What are the mission capable rates of the B-1 and B-52?
The last figures the Air Force published, for 2024, put the B-52H at 54 per cent and the B-1B at 43 per cent. The service no longer releases mission capable data, so no current figures exist publicly, and the September 2026 readiness announcement did not include any.
How many B-1 and B-52 bombers does the Air Force have?
Around 45 B-1B Lancers, after 17 of the most structurally fatigued aircraft were retired over the past five years, and 75 B-52H Stratofortresses. The B-52 fleet averages about 65 years old, with the newest airframe delivered in 1962.
What is the B-52J?
The B-52J is the designation for B-52H aircraft upgraded under the Commercial Engine Replacement Program, which replaces eight Pratt and Whitney TF33 engines with eight Rolls-Royce F130s. Cost has risen to about 15.4 billion dollars and initial operational capability has slipped to 2033.
When will the B-1B Lancer retire?
Later than previously planned. The Air Force has reversed its early-2030s retirement plan and now intends to operate the B-1 and B-2 through 2037, with roughly 342 million dollars of B-1 modernisation programmed for financial years 2027 to 2031, pending B-21 Raider deliveries.
Can I fly in a military jet?
Not in a bomber, but MiGFlug does fly members of the public in genuine military aircraft, including the L-39 Albatros and the MiG-29, with professional crews from approved airfields. Details and pricing are at migflug.com/flights-prices.

Related Posts

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *