COMAC
China’s state answer to Airbus and Boeing: a Shanghai company founded in 2008 that put the C919 into airline service in 2023, years late and still on American engines, and now chases a wide-body.
COMAC: the company and the aircraft that made its name
A state project with a long memory
COMAC was born of a government decision. On 26 February 2007 the State Council under Premier Wen Jiabao approved a national large-aircraft programme, and on 11 May 2008 the Commercial Aircraft Corporation of China was set up in Shanghai with registered capital of RMB 19 billion. Its shareholders were the aviation group AVIC, the state assets regulator SASAC, the city’s investment arm and the aluminium, steel and chemicals giants. Its final assembly line stood at Dachang, where its predecessor, the Shanghai Aircraft Manufacturing Factory, had assembled McDonnell Douglas airliners and the Y-10, China’s first home-grown jetliner attempt of the 1970s and 1980s.
The regional jet first
COMAC’s first product was inherited. The ARJ21 regional jet had been started in 2002 by an AVIC-led consortium that was folded into COMAC in 2008. It carries 78 to 90 passengers on a wing designed with help from Antonov and two American GE CF34 engines. It first flew on 28 November 2008, won Chinese certification only in December 2014 and entered service with Chengdu Airlines on 28 June 2016. Renamed the C909 in November 2024, it has since gone to TransNusa of Indonesia, Lao Airlines and VietJet, and 210 had been delivered by March 2026.
The C919: late, costly, flying
The C919 was the real ambition: a 158 to 168-seat rival to the A320 and 737. Launched in 2008 with a first flight targeted for 2014, it flew on 5 May 2017 and was certified by China’s regulator on 29 September 2022. Its announced budget was RMB 58 billion, but its cost has been estimated at well over RMB 125 billion. On 28 May 2023 China Eastern flight MU9191 carried the first fare-paying passengers from Shanghai to Beijing. By December 2024 the 16 C919s in service had flown more than a million passengers, and a shortened C919-600 flew on 29 July 2026.
Sanctions and spies
Self-reliance has limits. The C919 flies on CFM LEAP-1C engines and many Western systems, and the domestic CJ-1000A engine is not expected in daily service before about 2028. In January 2021 Washington named COMAC a company controlled by the People’s Liberation Army, and in May 2025 it briefly suspended LEAP-1C sales. American prosecutors say hackers of the Jiangsu state security bureau stole data from C919 suppliers between 2010 and 2015; in November 2022 a Jiangsu officer, Xu Yanjun, was convicted in the US of economic espionage and later jailed for 20 years. Claims that COMAC copied Western designs remain disputed.
Going abroad and going wide
Outside China, certification is the barrier. COMAC has worked with Europe’s EASA since 2020, but EASA said in 2025 that progress had been slow, and EASA test pilots flew verification flights in Shanghai only in January 2026. Air China flew the first scheduled international C919 service, Beijing to Ulaanbaatar, on 13 August 2026. A planned wide-body with Russia’s UAC, the CR929, became a purely Chinese C929 in 2023, with Air China named launch customer in 2024. COMAC wants to build 150 airliners a year; it delivered 15 C919s to the big three Chinese airlines in 2025.
COMAC in numbers
Şirket
- Kısacası
- Founded 11 May 2008
- State-owned, headquartered in Pudong, Shanghai
- Registered capital RMB 19 billion
- One headquarters and seven centres, including design, final assembly and flight test
- Offices in Singapore and Hong Kong since October 2024
Üretme
- En çok bilinen yönü
- C919 ve C909 (ARJ21)
- C909/ARJ21: 210 delivered by March 2026
- C919: 16 in service by December 2024; 15 delivered to major airlines in 2025
- C919-600 short variant flew July 2026; C919-800 stretch planned
- C929 wide-body in development
Bugün
- Şimdi
- Üretim aşamasında
- Target of 150 airliners a year within five years (set January 2023)
- Seeking EASA validation for the C919
- Exports of the C909 to Indonesia, Laos and Vietnam
Named on US lists of companies linked to the PLA since 2021.
Sayılar
- Registered capital
- RMB 19 billion (US$2.7 billion)2008
- C909/ARJ21 delivered
- 2102026
- C919 in service
- 162024
- C919 deliveries to the three major Chinese airlines
- 152025
- C919 revenue passengers carried
- more than 1 million2024
- C919 development cost
- budget RMB 58 billion; estimated well over RMB 125 billion
- C919 orders reported
- 1,061 (COMAC had claimed more than 1,200)2023
Every notable COMAC aircraft
| Uçak | Rol | İlk uçuş | İnşa edildi | Durum | Not |
|---|---|---|---|---|---|
| COMAC C909 (ARJ21 Xiangfeng) | 78–90 seat regional jet | 2008 | 210 delivered | Üretim aşamasında | Begun by AVIC in 2002; renamed C909 in 2024; freighter conversion from 2023 |
| COMAC C919 | 158–168 seat narrow-body airliner | 2017 | Üretim aşamasında | First delivery to China Eastern 9 December 2022; CFM LEAP-1C engines | |
| COMAC C919-600 | Shortened narrow-body variant | 2026 | Üretim aşamasında | Developed with Tibet (Xizang) Airlines; prototype flew 29 July 2026 | |
| COMAC C929 | Uzun menzilli geniş gövdeli yolcu uçağı | Üretim aşamasında | In development; first fuselage section targeted for September 2027; Air China launch customer |
Where COMAC built, who led it, what it achieved
Fabrikalar
- Final assembly centre, Pudong base · Shanghai Pudong International Airport — Shanghai Aircraft Manufacturing Co.; C919 assembly with its own runway
- Dachang base · Dachang airfield, Shanghai — Old Shanghai Aircraft Manufacturing Factory line; closed 20 January 2021 after the last ARJ21
- Flight test centre · Dongying, Shandong, and Zhuqiao, Shanghai — Opened 2016
- Jiangxi production and flight test centre · Yaohu airport, Nanchang — Completed 24 April 2021
- Design and research centre · Shanghai — Shanghai Aircraft Design and Research Institute, founded 30 November 2009
İnsanlar
- He Dongfeng · chairman — Announced the C919 short and stretched variants in 2023
Rekorlar ve ilkler
- First C919 revenue flight, China Eastern MU9191, Shanghai Hongqiao to Beijing, 28 May 2023
- First scheduled international C919 service, Air China, Beijing to Ulaanbaatar, 13 August 2026
- C919 fleet passed one million revenue passengers by December 2024
COMAC, year by year
ARJ21 development begins under an AVIC-led consortium
State Council approves the large-aircraft programme
COMAC founded in Shanghai
ARJ21 first flight
ARJ21 receives CAAC type certification
First C919 rolled out
ARJ21 enters service with Chengdu Airlines
C919 first flight
CRAIC wide-body joint venture with Russia’s UAC set up
US names COMAC a PLA-controlled company
C919 certified by the CAAC
C919 enters commercial service with China Eastern
Wide-body relaunched as the purely Chinese C929
ARJ21 rebranded C909
C919-600 first flight
First scheduled international C919 flight, Beijing to Ulaanbaatar
Everything people ask about COMAC
What does COMAC stand for?
When did the C919 enter service?
What engines does the C919 use?
Is the C919 certified in Europe?
What is the COMAC C909?
Is COMAC building a wide-body?
Around COMAC
Her bilgi kontrol edildi.
- Comac, Wikipedia (English)
- Comac C919, Wikipedia (English)
- Comac C909 (ARJ21), Wikipedia (English)
- Comac C929, Wikipedia (English)
- Zhongguo Shangyong Feiji, Wikipedia (Chinese)
Doğrulama tarihi: 2026-10-03.