Weser Flugzeugbau (Weserflug)

Weser Flugzeugbau (Weserflug)

Weser-Flugzeugbau GmbH · Weserflug

A Bremen shipyard’s aircraft offshoot that built more than 5,000 Stukas at Tempelhof, became the Reich’s fourth-largest aircraft maker on forced labour, and ended as half of VFW.

1934Fundado
Fusionado en VFW (Vereinigte Flugtechnische Werke) in 1964Estado
8Aeronaves registradas
PaísAlemaniaFundado1934SedeBremen (Lemwerder works); management in Berlin until 1944EstadoFusionado en VFW (Vereinigte Flugtechnische Werke) in 1964
La historia

Weser Flugzeugbau (Weserflug): the company and the aircraft that made its name

A shipyard learns to fly

Weserflug was born in 1934 because a shipbuilder wanted a second business. Deutsche Schiff- und Maschinenbau AG, the Bremen group behind the AG Weser yard, set up the company and that same year absorbed the struggling Rohrbach Metall-Flugzeugbau of Berlin. Adolf Rohrbach, a pioneer of all-metal aircraft, became technical director of a new factory at Lemwerder that opened in 1936. His own ideas ran ahead of the times: the P.1003 of 1938 was a tilt-wing VTOL design with swivelling four-metre propellers that was never built.

Stukas at Tempelhof

Weserflug’s real job was licence production on a vast scale. At Berlin-Tempelhof, Lemwerder and Liegnitz it built Junkers Ju 86, Ju 87, Ju 188 and Ju 388 aircraft and Focke-Wulf Fw 190 fighters. Between 1940 and 1945 Tempelhof alone turned out 5,215 Ju 87 Stukas. German Wikipedia ranks the firm as the Reich’s fourth-largest aircraft manufacturer by the war’s end, with 22,904 workers in 1944. Much of that labour was forced: on 20 April 1944, 2,103 of Tempelhof’s 4,151 workers were foreign forced labourers, and concentration camp prisoners dug an underground plant at Rabstein in the Sudetenland.

From Noratlas to VFW

After 1945 German aircraft production stopped. Horst Janson, appointed trustee of Weser AG’s assets in 1948, steered Bremen’s post-war reindustrialisation and became chairman of Weser AG in 1960. When it resumed, Weserflug joined Hamburger Flugzeugbau and Siebel in Flugzeugbau Nord to licence-build the Nord Noratlas transport for the new Bundeswehr, and in 1961 joined the ERNO rocket consortium. Its own story ended in a merger with its Bremen neighbour Focke-Wulf, creating Vereinigte Flugtechnische Werke. The Lemwerder site lived on in VFW and its successors.

A Bremen shipyard’s aircraft offshoot that built more than 5,000 Stukas at Tempelhof, became the Reich’s fourth-largest aircraft maker on forced labour, and ended as half of VFW.Weser Flugzeugbau (Weserflug) · verified 2026-10-03

De un vistazo

Weser Flugzeugbau (Weserflug) in numbers

La empresa

En breve
Fundada en 1934

  • Aircraft subsidiary of the DESCHIMAG shipbuilding group, Bremen
  • Took over Rohrbach Metall-Flugzeugbau in 1934
  • Taken over by the Krupp group in 1941

Producción

Más conocido por
5,215 Ju 87 Stukas

  • Licence-built Ju 86, Ju 87, Ju 188, Ju 388 and Fw 190
  • Own designs: We 271 amphibian, P.1003 VTOL project
  • Post-war Noratlas licence work through Flugzeugbau Nord

Hoy

Ahora
Merged into VFW

  • Merged with Focke-Wulf to form VFW (1961 or 1964, sources differ)

The Lemwerder works continued under VFW and its successors.

Los números

Ju 87 built at Tempelhof
5,2151940–1945
Empleados
22,9041944
Forced labourers at Tempelhof
2,103 of 4,151 workers1944

El avión

Every notable Weser Flugzeugbau (Weserflug) aircraft

Aeronave Role Primer vuelo Construido Estado Nota
Junkers Ju 86 (licence) Bomber / transport Jubilado Built at Lemwerder
Junkers Ju 87 Stuka (licence) bombardero en picado 5,215 Jubilado Built at Berlin-Tempelhof
Focke-Wulf Fw 190 (licence) Combatiente Jubilado Built at Tempelhof
Junkers Ju 188 and Ju 388 (licence) Bomber / reconnaissance Jubilado Built at Liegnitz and elsewhere
Weserflug We 271 Light amphibian 1938 1 Jubilado Twin Argus engines, rectangular Rohrbach wing; prototype D-ORBE
Messerschmitt Bf 163 STOL liaison prototype 1938 Jubilado Handed to Weserflug by Messerschmitt; lost to the Fi 156
Weserflug P.1003 Tilt-wing VTOL project Jubilado Design study of 1938, never built
Nord Noratlas (licence) Transporte militar Jubilado Through Flugzeugbau Nord for the Bundeswehr

Lugares, personas, registros

Where Weser Flugzeugbau (Weserflug) built, who led it, what it achieved

Fábricas

  • Tempelhof works · Berlin — Ju 87 and Fw 190 production
  • Lemwerder works · Lemwerder, near Bremen — Opened 1936; Ju 86 production
  • Liegnitz works · Liegnitz, Silesia (now Legnica, Poland) — Wartime factory
  • Rabstein underground plant · Rabstein, Sudetenland (now Czech Republic) — Dug by concentration camp prisoners from 1944; Ju 87 parts

Gente

  • Adolf Rohrbach · technical director from 1935 — All-metal aircraft pioneer; VTOL studies
  • Horst Janson · trustee, later chairman of Weser AG — Led post-war reindustrialisation in Bremen

Cronología

Weser Flugzeugbau (Weserflug), year by year

1934

Founded by DESCHIMAG; takes over Rohrbach Metall-Flugzeugbau

1935

Adolf Rohrbach becomes technical director

1936

Lemwerder factory opens

1938

We 271 amphibian flies; P.1003 VTOL designed

1940

Ju 87 production begins at Tempelhof

1941

Taken over by the Krupp group

1944

Management moves to Hoykenkamp; takes over Focke-Achgelis

1954

Joins Flugzeugbau Nord for Noratlas licence production

1961

Joins the ERNO rocket consortium

1964

Formal merger with Focke-Wulf creates VFW



Preguntas y respuestas

Everything people ask about Weser Flugzeugbau (Weserflug)

What was Weserflug?
The aircraft subsidiary of the Bremen shipbuilding group DESCHIMAG, active from 1934 until its merger into VFW.
How many Stukas did Weserflug build?
Its Tempelhof plant built 5,215 Junkers Ju 87s between 1940 and 1945.
Did Weserflug use forced labour?
Yes. In April 1944 more than half of the Tempelhof workforce were foreign forced labourers, and camp prisoners built its Rabstein underground plant.
What happened to Weserflug?
It merged with Focke-Wulf to form Vereinigte Flugtechnische Werke (VFW).



Fuentes y lecturas adicionales

Todos los datos, verificados

Verificado el 3 de octubre de 2026.