Siemens-Schuckert

Siemens-Schuckert

Siemens-Schuckertwerke GmbH (from 1927 AG) · SSW

The power-engineering half of Siemens built giant bombers with mechanics tending engines inside the fuselage, and the ‘flying beer barrel’, a rotary-engined fighter that out-climbed the Fokker D.VII.

MergedStatus
8Aeronaves registradas
Foto: Wikimedia Commons (Domínio público)
PaísAlemanhaFundada1 April 1903SedeBerlin (Siemensstadt); Erlangen from 1949StatusMerged
A história

Siemens-Schuckert: the company and the aircraft that made its name

Born of a merger

Siemens-Schuckert was created on 1 April 1903, when Siemens & Halske merged its heavy-current business with that of the Nuremberg firm Schuckert & Co. Siemens & Halske kept communications; the new Siemens-Schuckertwerke took power engineering, from turbines to tramway equipment, and briefly electric cars. The company was based in Berlin’s Siemensstadt. Aircraft were a wartime adventure that lasted barely five years, but they produced some of the most unusual machines of the First World War.

Giants with a mechanic aboard

The first were giants. The brothers Bruno and Franz Steffen designed the R.I, which first flew on 24 May 1915 with three engines inside the fuselage driving two propellers through clutches and gearboxes. If one engine failed, a mechanic could repair it in flight while the other two kept the aircraft aloft. For the acceptance flight Bruno Steffen ferried the inspection team to Döberitz with two armchairs and a bottle of champagne in the cabin. Seven R-types followed, some flying on the Eastern Front. Franz Steffen was killed in June 1916 testing the E.II monoplane.

Copying a Nieuport

Fighters began less heroically. When German monoplanes were outclassed by the Nieuport 11 and 17, Siemens-Schuckert was handed a captured Nieuport 17 to study. The resulting D.I was a fairly literal copy, except for its engine: the Siemens-Halske Sh.I, a geared rotary in which crankshaft and cylinders turned in opposite directions. By the time 95 were built in 1917 the D.I was obsolete, and most served as advanced trainers.

The flying beer barrel

The geared rotary grew into the 160 hp Sh.III, and around it the works built a fat, round-nosed biplane that pilots called the flying beer barrel. The D.III reached 1,000 metres in 1 minute 45 seconds, and the D.IV that followed could climb to 8,100 metres in 36 minutes, about 1,200 metres above the Fokker D.VII’s ceiling. About 41 D.IIIs reached Jagdgeschwader II in spring 1918, where substitute oils caused engine seizures. Some 123 D.IVs were built by the Armistice; one escaped to Switzerland and flew there until 1922.

Engines, and a dark postscript

Versailles ended SSW’s aircraft division. The Siemens-Halske engine line carried on, its Sh.14 radial selling more than 15,000, and became Bramo in 1936 before BMW bought it in 1939. During the Second World War Siemens-Schuckert ran a factory making aircraft parts at Monowitz near Auschwitz, served by the Bobrek concentration camp. On 1 October 1966 the Siemens-Schuckertwerke merged with Siemens & Halske and Siemens-Reiniger into today’s Siemens AG.

The power-engineering half of Siemens built giant bombers with mechanics tending engines inside the fuselage, and the ‘flying beer barrel’, a rotary-engined fighter that out-climbed the Fokker D.VII.Siemens-Schuckert · verified 2026-10-03

À primeira vista

Siemens-Schuckert in numbers

A empresa

Resumidamente
Founded 1903

  • Formed 1 April 1903 from the heavy-current arms of Siemens & Halske and Schuckert & Co.
  • Power engineering, rail and tram equipment; electric cars 1906–1910
  • Aircraft built 1915–1919
  • Head office moved from Berlin to Erlangen in 1949
  • Merged into Siemens AG on 1 October 1966

Produção

Mais conhecido por
D.III and D.IV fighters

  • Seven Steffen R-type giant bombers
  • D.I fighter, 95 built
  • D.IV fighter, 123 built by the Armistice
  • Siemens-Halske Sh.III geared rotary engine
  • Sh.14 radial, more than 15,000 of all versions

Hoje

Agora
Part of Siemens AG

  • Siemens-Schuckert D.III on display at the Luftwaffe Museum, Berlin-Gatow
  • Aero-engine line passed via Bramo to BMW in 1939

Os números

R-type giant bombers (R.I–R.VII)
7
D.IV built by the Armistice
123
D.III time to 1,000 m
1 min 45 s
D.IV time to 8,100 m
36 min
Siemens-Halske Sh.14-family engines built
more than 15,000

A aeronave

Every notable Siemens-Schuckert aircraft

Aeronave Papel Primeiro voo Construído Status Observação
Siemens-Schuckert Forssman Giant Giant aircraft (prototype) Spring 1915 1 Aposentado
Siemens-Schuckert R.I Giant bomber 24 May 1915 1 Aposentado Designed by Bruno and Franz Steffen; accepted 26 July 1915
Siemens-Schuckert R.II–R.VII Giant bombers Aposentado Forked rear fuselage; R.V to R.VII flew on the Eastern Front
Siemens-Schuckert E.I Caça monoplano late 1915 21 Aposentado First aircraft with the Siemens-Halske Sh.I rotary
Siemens-Schuckert D.I Lutador 1916 95 Aposentado Close copy of the Nieuport 17
Siemens-Schuckert R.VIII Six-engined giant bomber 2 (1 completed) Aposentado Ground trials only, 1919
Siemens-Schuckert D.III Fighter / interceptor October 1917 Aposentado 50 ordered; about 41 delivered to the front April–May 1918
Siemens-Schuckert D.IV Fighter / interceptor 1918 123 Aposentado Flown in Switzerland until 1922

Lugares, pessoas, registros

Where Siemens-Schuckert built, who led it, what it achieved

Fábricas

  • Siemensstadt · Berlin-Spandau — Head office and works district of the Siemens companies

Pessoas

  • Bruno and Franz Steffen · designers of the R-type giants — Franz Steffen was killed testing the E.II in June 1916

Recordes e pioneirismos

  • D.IV could reach 8,100 m in 36 minutes, about 1,200 m above the Fokker D.VII’s ceiling

Linha do tempo

Siemens-Schuckert, year by year

1 April 1903

Siemens-Schuckertwerke GmbH formed

1906

Electric car production begins (to 1910)

24 May 1915

Steffen R.I giant bomber makes its first flight

late 1915

E.I monoplane fighter flies with the Sh.I rotary

June 1916

Franz Steffen killed in the E.II prototype crash

1917

D.I, a Nieuport 17 copy, enters limited service

April 1918

D.III reaches Jagdgeschwader II

1919

R.VIII ground trials; Versailles ends aircraft work

1927

Converted into an Aktiengesellschaft

1936

Siemens-Halske engine business becomes Bramo

1 April 1949

Head office moves to Erlangen

1 October 1966

Merged into Siemens AG


Perguntas e Respostas

Everything people ask about Siemens-Schuckert

Did Siemens build aircraft?
Yes. Siemens-Schuckertwerke built giant bombers and fighters between 1915 and 1919, and the Siemens-Halske brand built aero-engines until the business became Bramo in 1936.
What was the flying beer barrel?
The pilots’ nickname for Siemens-Schuckert’s stubby D-series fighters with the big Sh.III geared rotary engine, known for their exceptional rate of climb.
How did the Siemens-Schuckert R.I work?
Three engines inside the fuselage drove two propellers through a shared gearbox, so a mechanic could work on one engine in flight while the others kept it flying.
Is there a surviving Siemens-Schuckert fighter?
A D.III is displayed at the Luftwaffe Museum at Berlin-Gatow.
What happened to Siemens-Schuckert?
It merged with Siemens & Halske and Siemens-Reiniger-Werke on 1 October 1966 to form Siemens AG.