Tupolev

Tupolev

Туполев · OKB-156 · ANTK imeni A. N. Tupoleva

Founded on a date its founder picked himself, Tupolev built the world’s largest aircraft of the 1930s, designed a bomber in a prison camp, copied the B-29, and flew the first supersonic airliner.

1922Založeno
AktivníPostavení
25Letadlo v záznamu
22Vzdušné síly létající na jeho typech
Photo (Tu-16 in a museum shown): parfaits / Wikimedia Commons (CC BY-SA 3.0)
ZeměRuskoZaloženo1922-10-22ZakladateléAndrei TupolevVelitelstvíBasmanny District, MoscowMajitelUnited Aircraft Corporation (since 2006), part of RostecPostaveníAktivní
Příběh

Tupolev: the company and the aircraft that made its name

A birthday chosen later

Tupolev’s official birthday is a choice. In 1922 a commission for building metal aircraft was set up at Moscow’s TsAGI aerodynamic institute under Andrei Tupolev, a protégé of the aviation pioneer Nikolay Zhukovsky. Twenty-five years later, on the eve of the bureau’s jubilee, Tupolev himself proposed 22 October 1922 as the date to celebrate, and it stuck. The team had started small, with aerosleds and a wooden glider boat, and its first aeroplane, the little ANT-1, flew on 21 October 1923. What followed was 50 years under one man and, by the company’s count, more than 300 projects, about 90 built and more than 18,000 aircraft produced by Soviet factories.

Giants in corrugated metal

Tupolev learned from Hugo Junkers. His early aircraft were all-metal, skinned in corrugated duralumin, starting with the ANT-2 of 1924. The TB-1 twin-engined bomber of 1925 was among the most advanced of its day, and the four-engined TB-3 that grew from it was built 818 times; in 1937 one landed at the North Pole. Then came the ANT-20 Maxim Gorky, with eight engines and a 63-metre wing, the largest aircraft in the world in the 1930s and the flagship of a propaganda squadron. On 18 May 1935 an escorting I-5 fighter looped around it, struck it, and both fell into a Moscow suburb. Forty-five people died.

Over the Pole

The bureau’s most famous record aircraft looked almost delicate: the single-engined ANT-25, with a wing built for range. In July 1936 Valery Chkalov, Georgy Baydukov and Alexander Belyakov flew it 9,374 km from Moscow to an island near the mouth of the Amur. On 18–20 June 1937 the same crew flew over the North Pole to America, running short of fuel and landing at Vancouver, Washington. Three weeks later Mikhail Gromov, Andrey Yumashev and Sergey Danilin went further, 11,500 km in 62 hours and 17 minutes, ending in a dairy pasture near San Jacinto, California. Chkalov’s ANT-25 was displayed at the 1939 New York World’s Fair.

The designer in the sharashka

By then its designer was in prison. On 21 October 1937, at the height of the Great Purge, Tupolev was arrested with Vladimir Petlyakov and the whole TsAGI leadership on invented charges of sabotage and espionage. Many colleagues were shot. Tupolev was sent in 1939 to an NKVD sharashka, a prison design office, which became known as Tupolevka after its best-known inmate. Sentenced to ten years in 1940, he designed there the twin-engined Tu-2, which first flew on 29 January 1941 and became one of the best Soviet front-line bombers; 2,257 were built. He was released in July 1941 to do defence work, but not fully rehabilitated until 1955.

Copying the Superfortress

The post-war Soviet Union needed a strategic bomber at once, and in 1944 three repairable American B-29s had fallen into its hands after emergency landings. The order was to copy them. Tupolev’s team did, re-engineering the design for metric sheet metal, Soviet engines and weapons; the Tu-4 flew on 19 May 1947 and 847 were built. From that base came the swept-wing Tu-16 and, in 1952, the Tu-95, with four huge turboprops whose propeller tips go supersonic, making it one of the loudest military aircraft. A Tu-95 dropped the Tsar Bomba in 1961. Bears still fly; Ukraine’s Operation Spiderweb destroyed several on their airfields on 1 June 2025.

Aeroflot’s jet age

The Tu-16 bomber also became an airliner. The Tu-104 entered Aeroflot service on 15 September 1956 and, after the British Comets were grounded, was for two years the only jetliner flying anywhere. The Tu-95 begat the Tu-114, still the fastest turboprop airliner ever built, and the Tu-124 of 1960 was the first turbofan airliner built in series. Then came the Tu-134 and the trijet Tu-154, 1,026 of which carried half of all Aeroflot passengers in 1990. On 10 April 2010 a Polish Air Force Tu-154 crashed in fog at Smolensk, killing all 96 on board, among them President Lech Kaczyński; investigators found no technical fault.

Supersonic, and after

Andrei Tupolev’s son Alexei led the bureau’s most ambitious airliner, the Tu-144. Rushed to meet a five-year-old government deadline, it flew on 31 December 1968, two months before Concorde. On 3 June 1973 the first production aircraft broke up during a display at the Paris Air Show, killing six crew and eight people on the ground in Goussainville. Passenger service lasted just 55 flights, ending in June 1978. The Tu-160 bomber of 1981 set 44 world records. Tupolev joined United Aircraft Corporation in 2006 and has been sanctioned since 2022; its Kazan plant delivered only one new Tu-214 in 2025 against far bigger state targets.

Founded on a date its founder picked himself, Tupolev built the world’s largest aircraft of the 1930s, designed a bomber in a prison camp, copied the B-29, and flew the first supersonic airliner.Tupolev · verified 2026-10-03

Na první pohled

Tupolev in numbers

Společnost

Stručně řečeno
Founded 1922

  • Grew from a metal-aircraft commission at TsAGI in Moscow, led by Andrei Tupolev
  • Led by Andrei Tupolev until his death in 1972, then by his son Alexei
  • Joint-stock company from 1999; part of United Aircraft Corporation since 2006
  • Branches: Kazan Aviation Plant, Zhukovsky flight test base, Samara and Ulyanovsk design offices

Výroba

Nejznámější pro
Bombers and airliners

  • Famous types: TB-3, ANT-25, Tu-2, Tu-4, Tu-16, Tu-95, Tu-104, Tu-134, Tu-144, Tu-154, Tu-22M, Tu-160
  • More than 18,000 aircraft built to Tupolev designs
  • Tu-154: 1,026 built, the standard Soviet airliner

Dnes

Teď
Part of UAC

  • Builds the Tu-214 airliner and Tu-160M bomber at Kazan
  • Supports the Tu-95MS, Tu-22M3 and Tu-160 bomber fleets
  • Under EU, US and other sanctions since 2022

Tu-214 output has repeatedly missed state targets: one new aircraft was delivered in 2025.

Čísla

Aircraft built to Tupolev designs
více než 18 000
Projekty
more than 300, about 90 built, more than 50 in series production
World records
about 280 (company history); 78 on aircraft designed under Andrei Tupolev
Tu-154 built
1,026
Tu-16 built
1,509
Tu-160 records
44 world records1989–1990
Tu-214 deliveries
1 new aircraft2025

Letadlo

Every notable Tupolev aircraft

Tupolev Tu-2Front-line bomber · first flight 1941 · 2,257 builtTupolev Tu-4Strategic bomber · first flight 1947 · 847 builtTupolev Tu-16Medium bomber · first flight 1952 · 1,509 builtTupolev Tu-95Strategic bomber · first flight 1952 · more than 500 builtTupolev Tu-22Supersonic bomber · first flight 1959 · 311 builtTupolev Tu-134Short-range airliner · first flight 1963 · 854 builtTupolev Tu-154Medium-range airliner · first flight 1968 · 1,026 builtTupolev Tu-22MSupersonic swing-wing bomber · first flight 1969 · 497 builtTupolev Tu-143Reconnaissance drone · first flight 1970 · 950 builtTupolev Tu-160Supersonic strategic bomber · first flight 1981 · about 41 built

Photos: Zala · CC BY-SA 4.0; calflier001 / Wikimedia Commons (CC BY-SA 2.0); public domain; parfaits / Wikimedia Commons (CC BY-SA 3.0); U.S. Navy · Public domain; Steelhead 2010 / Wikimedia Commons (CC BY 2.0); Oleg V. Belyakov – AirTeamImages / Wikimedia Commons (CC BY-SA 3.0); George Chernilevsky / Wikimedia Commons (CC BY-SA 3.0); Andrey Belenko · CC BY 2.0

Letadlo Role První let Postavený Postavení Poznámka
Tupolev ANT-2 Light passenger aircraft 1924 V důchodu Early all-metal Tupolev design in corrugated duralumin
Tupolev TB-1 (ANT-4) Těžký bombardér 1925 218 V důchodu Twin-engined all-metal bomber, among the most advanced of its time
Tupolev ANT-9 Dopravní letadlo 1929 asi 100 V důchodu Early Tupolev passenger aircraft; in service until 1945
Tupolev TB-3 (ANT-6) Těžký bombardér 1930 818 V důchodu Four-engined; one landed at the North Pole in 1937
Tupolev ANT-20 Maxim Gorky Propaganda aircraft 1934 2 V důchodu Largest aircraft in the world in the 1930s; first example lost in a 1935 mid-air collision
Tupolev ANT-25 Long-range record aircraft 1933 2 V důchodu Flew Moscow to the USA over the North Pole in 1937
Tupolev SB (ANT-40) Fast bomber 1934 6,656 V důchodu Most-produced Tupolev type; Spain retired its last in 1950
Tupolev Tu-2 Front-line bomber 1941 2,257 V důchodu Designed while Tupolev was a prisoner in an NKVD sharashka
Tupolev Tu-4 Strategický bombardér 1947 847 V důchodu Reverse-engineered copy of the Boeing B-29
Tupolev Tu-16 Střední bombardér 1952 1,509 V důchodu Still built and flown in China as the Xian H-6
Tupolev Tu-95 Strategický bombardér 1952 more than 500 V provozu Contra-rotating turboprops; dropped the Tsar Bomba in 1961
Tupolev Tu-104 Tryskové letadlo 1955 201 V důchodu Only jetliner in regular service worldwide from 1956 to 1958
Tupolev Tu-114 Long-range turboprop airliner 1957 32 V důchodu Fastest turboprop airliner ever built
Tupolev Tu-22 Nadzvukový bombardér 1959 311 V důchodu Libya flew the last examples into the early 2000s
Tupolev Tu-124 Short-range airliner 1960 164 V důchodu First turbofan airliner built in series
Tupolev Tu-28 Dálkový stíhač 1961 198 V důchodu Long-range interceptor for the Soviet air defence forces; retired in 1990
Tupolev Tu-134 Short-range airliner 1963 854 V provozu Still in limited use
Tupolev Tu-142 Námořní hlídkové letadlo 1968 100 V provozu Anti-submarine development of the Tu-95; India retired its fleet in 2017
Tupolev Tu-144 Supersonic airliner 1968 16 V důchodu First supersonic transport to fly; 55 passenger flights
Tupolev Tu-154 Medium-range airliner 1968 1,026 V provozu Carried half of Aeroflot’s passengers in 1990
Tupolev Tu-22M Supersonic swing-wing bomber 1969 497 V provozu Long-range strike and maritime bomber
Tupolev Tu-143 Průzkumný dron 1970 950 V provozu Built by Tupolev’s K department for unmanned aircraft
Tupolev Tu-160 Nadzvukový strategický bombardér 1981 about 41 Ve výrobě Nicknamed White Swan; new-build Tu-160M2 under way at Kazan
Tupolev Tu-204 / Tu-214 Medium-range airliner 1989 89 by 2015 Ve výrobě Russian-parts Tu-214 certified in December 2025
Tupolev Tu-334 Regionální letadlo 1999 2 Cancelled after two prototypes

Kdo s nimi létá

Tupolev aircraft in the world’s air forces

22 air forces in the Order of Battle fly or flew Tupolev types. 5 z nich má stále jeden v provozu.

Letectvo V provozu Dříve létal
Ruské vzdušné síly Tupolev Tu-160 a Tu-160M, Tupolev Tu-95MS/MSM, Tupolev Tu-22M3/M3M, Tupolev Tu-214R, Tupolev Tu-134, Tu-154 and Ilyushin Il-62M, Tupolev Tu-160M (nová konstrukce) Tupolev Tu-16
Ruské námořní letectvo Tupolev Tu-142M3/MR/MK/MZ, Tupolev Tu-134 (including Tu-134UB-L) Tupolev Tu-22M2/M3, Tupolev Tu-16 (Tu-16KS, Tu-16K-10 and others), Tupolev Tu-22P, Tupolev Tu-95RTs
Kazašské síly protivzdušné obrany Tupolev Tu-154 a Tu-134 Tupolev Tu-95 Medvěd
Letectvo Lidové osvobozenecké armády Xian Y-7, Shijiazhuang Y-5 a Tupolev Tu-154M Tupolev Tu-4 a KJ-1, Lavochkin La-11 and Tupolev Tu-2
Tádžické letectvo Tupolev Tu-134AK
Vzdušné síly a síly protivzdušné obrany Běloruské republiky Tupolev Tu-22M3, Tupolev Tu-16A
Arménské letectvo Tupolev Tu-134 a Tu-154
Bulharské letectvo Tupolev Tu-2
Egyptské letectvo Tupolev Tu-16
Německé letectvo Antonov An-26, Tupolev Tu-134A, Tu-154M, Iljušin Il-62M a Let L-410
Maďarské letectvo Tupolev Tu-2
Indické námořní letectvo Tupolev Tu-142MK-E
Indonéské letectvo Tupolev Tu-16, Tu-16KS-1 a Tu-16R, Tupolev Tu-2
Irácké letectvo Tupolev Tu-16, Tupolev Tu-22
Letectvo Korejské lidové armády Tupolev Tu-2
Libyjské letectvo Tupolev Tu-22A/B a Tu-22UD
Moldavské letectvo Tupolev Tu-134
Námořní letectvo Lidové osvobozenecké armády Tupolev Tu-2
Polské letectvo Tupolev Tu-154M, Tupolev Tu-2
Rumunské letectvo Tupolev Tu-2
Královské kambodžské letectvo Antonov An-24 and Tupolev Tu-134
Ukrajinské letectvo Tupolev Tu-160, Tupolev Tu-95MS a Tu-95M, Tupolev Tu-22M2 a Tu-22M3, Tupolev Tu-22, Tupolev Tu-16, Tupolev Tu-134 and 1 more

Místa, lidé, rekordy

Where Tupolev built, who led it, what it achieved

Továrny

  • Kazan Aviation Plant named after S. P. Gorbunov (KAPO) · Kazan, Tatarstan — Tupolev branch; builds the Tu-214 and Tu-160; has built more than 18,000 aircraft of 34 types
  • Zhukovsky flight test and development base · Zhukovsky, Moscow Oblast — Tupolev branch where prototypes such as the Tu-144 first flew
  • Samara and Ulyanovsk design branches · Samara and Ulyanovsk — Design offices supporting series production
  • 360th Aircraft Repair Plant · Ryazan — Under Tupolev management since 2018

Lidé

  • Andrei Tupolev · founder and general designer, 1922–1972 — Imprisoned 1937–1941; three times Hero of Socialist Labour; Vnukovo airport named after him in 2018
  • Alexei Tupolev · son of the founder, chief designer of the Tu-144 — Led the company until his death in 2001
  • Vladimir Petlyakov · engineer — Arrested with Tupolev in 1937
  • Valery Chkalov · test pilot — Flew the ANT-25 over the North Pole to the USA in 1937
  • Mikhail Gromov · test pilot — First flew the ANT-25 in 1933; flew it Moscow to San Jacinto in 1937
  • Igor Shevchuk · president and general designer, 2001–2009 — Died in 2011

Rekordy a prvenství

  • Largest aircraft in the world in the 1930s, ANT-20 Maxim Gorky (t4)
  • Moscow to Vancouver, Washington, non-stop over the North Pole, ANT-25, 18–20 June 1937 (t5)
  • Moscow to San Jacinto, California, 11,500 km in 62 hours 17 minutes, ANT-25, 12–14 July 1937 (t5)
  • Only jetliner in regular service worldwide, Tu-104, 1956–1958 (t12)
  • Fastest turboprop airliner ever built, Tu-114 (t1)
  • First supersonic transport to fly, Tu-144, 31 December 1968; first commercial transport past Mach 2, 26 May 1970 (t17)
  • Most powerful nuclear device ever detonated dropped by a modified Tu-95, 30 October 1961 (t11)
  • 44 world speed records in its weight class, Tu-160, 1989–1990 (t21)

Časová osa

Tupolev, year by year

1922

Date later chosen by Andrei Tupolev as the bureau’s founding; metal aircraft commission at TsAGI

1923

First Tupolev aircraft, the ANT-1, flies

1924

All-metal ANT-2 first flies

1930

TB-3 four-engined bomber first flies

1934

ANT-20 Maxim Gorky, the world’s largest aircraft, first flies

1935

Maxim Gorky destroyed in a mid-air collision over Moscow; 45 killed

1937

Chkalov’s ANT-25 lands in Vancouver, Washington, after crossing the North Pole

1937

Andrei Tupolev arrested in the Great Purge

1941

Tu-2, designed in prison, first flies

1947

Tu-4 B-29 copy first flies

1952

Tu-95 strategic bomber first flies

1956

Tu-104 enters Aeroflot service

1961

Tu-95 drops the Tsar Bomba

1968

Tu-144 becomes the first supersonic airliner to fly

1972

Andrei Tupolev dies; son Alexei leads the bureau

1973

Tu-144 crashes at the Paris Air Show

1981

Tu-160 first flies

2006

Joins United Aircraft Corporation

2010

Polish Air Force Tu-154 crashes at Smolensk, killing President Kaczyński and 95 others

2025

Operation Spiderweb destroys several Tu-95MS bombers on the ground


Otázky a odpovědi

Everything people ask about Tupolev

Who founded Tupolev?
Andrei Tupolev, a student of the Russian aviation pioneer Nikolay Zhukovsky. The company dates itself to 22 October 1922, a date Tupolev himself proposed on the eve of the bureau’s 25th anniversary, and he led it until his death in 1972.
Was the Tu-4 a copy of the B-29?
Yes. In 1944 several B-29s made emergency landings in Soviet territory and were interned. Tupolev’s bureau reverse-engineered them, adapting the design to metric materials and Soviet engines. The Tu-4 first flew on 19 May 1947 and 847 were built.
Did the Tu-144 fly before Concorde?
Yes. The Tu-144 first flew on 31 December 1968, two months before Concorde, and went supersonic in June 1969. It made only 55 passenger flights before passenger service ended in 1978.
Is Tupolev still making aircraft?
Yes. Tupolev is part of United Aircraft Corporation and builds the Tu-214 airliner and the Tu-160M bomber at its Kazan plant, though Tu-214 output has fallen far short of state targets.
Why was Andrei Tupolev imprisoned?
He was arrested on 21 October 1937 during Stalin’s Great Purge on fabricated charges of sabotage and espionage. He worked in a prison design bureau, where he designed the Tu-2 bomber, and was released in July 1941.
How many aircraft has Tupolev built?
More than 18,000 aircraft have been built to Tupolev designs, most of them by Soviet series factories rather than the bureau itself.